
Steam decentralization and barracks HVAC under a utility energy service contract
Commissioning authority for two energy conservation measures: replacing a central steam loop with building-level boiler plants across eight buildings, and a full HVAC replacement in a barracks with dedicated outdoor air units, fan coils, an air-cooled chiller, and a condensing boiler.
Design review caught a boiler efficiency deviation from the contract, a removed system still in the test scope, and a controls protocol conflict before construction started.
- Commissioning plan
- Design review
- Test matrix
- Pre-functional checklists
- Controls integration











